S.No Scope of Work Client Name Projects Name

1

Falling Weight Deflectometer (FWD)

M/s KNR Constructions Ltd

Improvement / Augmentation of Four Laning of existing Thiruvananthapuram Bypass with new alignment further as alternative road for existing NH-47 from Kazhakkoottam (Thiruvananthapuram) to Mukkola Junction (Km.0.00 to to Km.26.50) under NHDP Phase IIIA in the State of Kerala on EPC Mode NH-47

2

BBD survey & Sample Collection and Testing

M/s KNR Constructions Ltd

“Improvement/Augmentation of Four Laning from [Design Chainage Km 5.000 to Km 81.000] and Two Laning with Paved Shoulders from [Design Chainage KM 81.000 to Km 120.000] of Madurai – Ramanathapuram section of NH-49 [Total Design Length 115.000 KM]

NH49

3

Correspondence support for periodic Maintenance for reduction of Thickness of BC Renewal Coat and Geometric Improvement

M/s Adilabad Expressway Private Limited

Design, Construction, Development, Finance, Operation and Maintenance four laning of the existing two lane portion divided carriageway facility from Km 175.000 (Mah/TG Border) to Km 230.000 (Islam Nagar) onNH-44(Old NH-7) in the state of Telangana under North-South corridor on Build operation and Transfer (Annuity) Basis Package No. NS2/BOT/AP-6 AP-06 (NH-44)

4

Traffic survey

M/s KNR Constructions Ltd

Walayar- Vadakkancherry Section of NH-47 KL2

5

Conduction Soil Investigation survey for proposed VUP, ROB, Flyover, Box Culvert structures & any other specified locations on proposed DBTPL Project Highway, in the State of Madhya Pradesh

M/s IJM (I) Infrastructure Limited

Widening & Up-gradation of Dewas Bypass road from Km 0+000 at Ujjain Dewas Junction and Ends at Km 19+800 starts at Indore Junction to Four / Six laning of in the State of Madhya Pradesh on DBFOT basis Dewas By Pass

6

Study on the estimated cost of 2nd & 3rd Major Maintenance

M/s Patel - KNR JV

Design, Construction, Development, Finance, Operation and Maintenance of Islam Nagar (Km.230.000)-Kadthal (Km.278.000) in the State of Andhra Pradesh under North-South Corridor (NHDP Phase-II) on BOT(ANNUITY) Basis package No.NS2/BOT/AP-7(PKHIL) Islamnagar - Kadthal

7

Physical measurement and quantification of Executed work

M/s Bhrunda Infra Private Limited

  • Construction of Phase-I works Comprising Earth Work, PCC, RCC Works, Bore well etc. for Research Lab with R&D Office, Hostel Block including Guest House, Type III Residential quarters, Animal House, Security Lodge, Animal Farms for NIAB, Hyderabad(Pkg-1)
  • Construction of Phase-I works Comprising Research Lab with R&D Office, Hostel Block including Guest House, Security Lodge, Animal Farms, Animal House including associated works for NIAB, Hyderabad(Pkg-2)
  • Construction of Internal Roads in NIAB campus, Gachibowli, Hyderabad
NIAB Pkg 1 & 2 & Campus, Hyderabad

8

Traffic survey & Inventory & Topographical Survey

M/s Vasishta Projects

Rehabilitation and Up-gradation of Arvi to Talegaon (Section II) Design Chainage From Km 59/900 to Km 73/600 [Existing Chainage From Km 59/900 (Arvi) to Km 73/550 (Talegaon)] of Wardha-PulgaonRohana-Arvi-Ashti-Haturna-Warud-Multai National Highway section - 347 A to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract Arvi to Talegaon NH-347

9

Geo Technical Investigations

M/s JSR Infra Ltd

Construction of Four Lane divided Highway from Melur (Design Km.0.000/ Existing Km.99.920 of NH-38) to Karaikudi (Design Km.45.855/ Existing Km.12.900 of NH-383 Ext.)Design Length Km.45.855 Km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC Melur to Karaikudi

10

Conducting BBD and Test Pit Surveys

M/s Dwaraka Constructios

Strengthening of selected stretches (35.40kms) from km. 85/0 to 95/0, KM 107/0 to 131/8 and 137/0 to 137/6 of Renigunta-Kadapa road of NH 716 in the state of Andhra Pradesh om EPC mode Renigunta-Kadapa